Public works projects in a part of the Big Easy, the Gentilly Resiliency District, will be designed to retain and control water rather than to try to keep it behind levees and floodwalls.
It means that FERC can continue to hold that small electric power generators, including businesses and residences, can have their power priced at the wholesale rate.